Managing work teams on major infrastruture projects abroad. Expatriate from the beginning of my career, I am very adaptable to new environments,able to anticipate, motivate the teams and work groups. Guarantor of quality and safety, I manage the interfaces between the stakeholders of the construction site (design, methods, suppliers, local authorities, etc.)
It is through the technical diversity of various Major construction projects that I've acquired a solid knowledge such as:
o Segments erection with launching girder (Hong Kong)
o Drill and blast tunnel (Hong Kong)
o Construction and sinking of pre-cast immersed tunnel (Germany)
o Highway construction, manufacturing and paving 500000tons asphalt (Jamaica)
o Construction of a railway line between Johannesburg and Pretoria including bridges, viaducts, earthworks, roadworks(South Africa)
BOUYGUES TP Johannesburg (South Africa)
Project Manager, in charge of the tunnel remedial works of the section of tunnel between Park Station and Rosebank. 900 meters of treatement area by cementicious injection of the invert slab and seepage treatement of the tunnel lenght , on the project GAUTRAIN.
BOUYGUES TP Johannesburg (South Africa)
Project Quality Manager, monitoring and advising on the performance of the quality management system, producing data and reports on performances, measuring against set indicators. Liaise with other managers and staff throughout the organization to ensure that the QA system is functioning properly. Where appropriate, advise on changes and their implementation and provide training, tools and techniques to enable others to achieve quality.
BOUYGUES TP Johannesburg (South Africa)
Senior Construction manager, design package DP6A linear works as well as Area manager in charge of the Civil Works and equipments on design package DP5, construction of 22 bridges (Overpass and underpass), 3 viaducts, installation of 2,500 ml of noise barriers, 11,7 km of drainage, various civil works structures (75,000 m3 concrete in total), earthworks , on the project GAUTRAIN.
BOUYGUES TP Kingston (Jamaica)
Construction manager in charge of the Civil Works, Road Works and Highway equipments, construction of 22 Highway bridges (Overpass and underpass), fabrication en paving of 500,000 tons of asphalt, on the project Highway 2000 Jamaica.
BOUYGUES TP Rostock (Germany)
Senior Site Engineer in charge of the construction of the tunnel entrance portals and access ramps East and West, in charge of the construction of 5 Highway bridges, on the project Feste Warnowquerung Rostock.